Overhaul of 0.4kV distribution board and electrical control room

PGNiG TERMIKA SA Siekierki Power Plant

Project

Overhaul of 0.4kV distribution board and electrical control room

Deadline

2016

PGNiG TERMIKA SA Siekierki Power Plant

Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.

Services

"The investment was closely tied to the schedule and was executed on time."

Industry

Commercial power industry

Project engineer

Paweł Perłowski
(+48) 668 022 097
pawel.perlowski@konrem.pl

Power engineering, telecommunications engineering: - overhaul and modernizations according to customer’s assumptions or with technical support (audit), - projects and installing automation system and control & measurement devices

Challenge

  • overhaul of 0.4 kV distribution board and electrical control room
  • development of a new distribution board with modern equipment
  • maintenance and restoration of primary circuits
  • efficient and failure-free electric start

Solution

  • replacement of LV distribution board with a new one
  • inspection and maintenance of FAT power supplies
  • inspection and maintenance of 0.4 kV primary circuits
  • Breaker Failure Protection check-up
  • linear and clutch protection check-up and transformer measurements

Result

  • launch of a new LV distribution board
  • ensuring proper functioning of electrical equipment in the CHP plant
  • verification of security operation - measurement protocols