Overhaul of 0.4kV distribution board and electrical control room
PGNiG TERMIKA SA Siekierki Power PlantProject
Overhaul of 0.4kV distribution board and electrical control room
Deadline
2016
PGNiG TERMIKA SA Siekierki Power Plant
Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.
Services
"The investment was closely tied to the schedule and was executed on time."
Industry
Commercial power industry
Project engineer
Paweł Perłowski
(+48) 668 022 097
pawel.perlowski@konrem.pl
Power engineering, telecommunications engineering: - overhaul and modernizations according to customer’s assumptions or with technical support (audit), - projects and installing automation system and control & measurement devices
Challenge
- overhaul of 0.4 kV distribution board and electrical control room
- development of a new distribution board with modern equipment
- maintenance and restoration of primary circuits
- efficient and failure-free electric start
Solution
- replacement of LV distribution board with a new one
- inspection and maintenance of FAT power supplies
- inspection and maintenance of 0.4 kV primary circuits
- Breaker Failure Protection check-up
- linear and clutch protection check-up and transformer measurements
Result
- launch of a new LV distribution board
- ensuring proper functioning of electrical equipment in the CHP plant
- verification of security operation - measurement protocols