Execution, delivery and assembly of complete belt conveyor drives

PGNiG TERMIKA SA Żerań CHP Plant

Project

Execution, delivery and assembly of complete belt conveyor drives

Deadline

2015

PGNiG TERMIKA SA Żerań CHP Plant

Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.

Services

Power engineering, telecommunications engineering:
- project and construction of technological lines and equipment
- projects and visualizations of superior systems (SCADA systems)
- projects and installing automation system and control & measurement devices

Industry

Commercial power industry

Project engineer

Adam Madej
(+48) 668 022 095
adam.madej@konrem.pl

"The investment required a quick reaction due to shutdown of individual devices in the heating plant was closely tied to the schedule."

Challenge

  • delivery, assembly and launch of drives of T10II and T11II inclined belt conveyors

Solution

  • execution of works in the electrical, mechanical and I&C area
  • disassembly of old drives and power supply
  • assembly of new drives together with electrical and I&C
  • launch of new belt conveyor drives

Result

  • extending the service life of the main carburising devices in the CHP plant
  • ensuring proper functioning of carburising equipment
  • the ability to operate the conveyor at two speeds