Overhaul of water management devices at Żerań Heat and Power Plant
PGNiG TERMIKA SA Żerań CHP PlantProject
Overhaul of water management devices at Żerań Heat and Power Plant
Deadline
2017
PGNiG TERMIKA SA Żerań CHP Plant
Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.
Services
Mechanics:
- overhaul and modernization according to client's instructions or with technical support (audit)
- production of technological equipment and spare parts
Industry
Commercial power industry
Project engineer
Adam Madej
(+48) 668 022 095
adam.madej@konrem.pl
"The investment required a quick execution due to the withdrawal of individual devices in the power plant. The investment was carried out strictly on schedule. Transportation of oversized elements and their assembly at the heating plant."
Challenge
- comprehensive overhaul of water management devices
- construction and transport of a tank with a diameter of 4.6 m and a height of 10 m
- performing the necessary additional and finishing works
Solution
- replacement of pipelines and fittings with anthracite filters and other water management systems
- overhaul of gravel filters
- overhaul of the decarbonisation reactor
- modernization of the sludge scraper
Result
- extending the service life of the main water management devices in the combined heat and power plant
- ensuring proper operation of water management devices in the combined heat and power plant
- restoring the full efficiency of the devices