Overhaul of a busbar at T13/1 for stacker no. 1 and loader no. 3
PGNiG TERMIKA SA Siekierki Power PlantProject
Overhaul of a busbar at T13/1 for stacker no. 1 and loader no. 3
Deadline
2016
PGNiG TERMIKA SA Siekierki Power Plant
Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.
Services
Mechanics:
- overhauls and modernization according to the customer’s assumptions or with technical support (audit)
Industry
Commercial power industry
Project engineer
Paweł Perłowski
(+48) 668 022 097
pawel.perlowski@konrem.pl
"The investment was closely tied to the schedule and was executed on time."
Challenge
- overhaul of the busbar at T13/1 for the stacker no. 1 and the loader no. 3 consisting of replacing the existing busbar subassemblies with new ones
Solution
- new busbar installation for stacker no. 1 and loader no. 3
Result
- modernized power supply for the loader and stacker
- comprehensive installation and more efficient commissioning of devices