Overhaul of 110, 15, 6kV distribution boards, transformers and cable networks
PGNiG TERMIKA SA Siekierki Power PlantProject
Overhaul of 110, 15, 6kV distribution boards, transformers and cable networks
Deadline
2016
PGNiG TERMIKA SA Siekierki Power Plant
Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.
Services
Mechanics, power engineering, telecommunications engineering:
- overhaul and modernization according to customer’s assumptions or with technical support (audit)
Industry
Commercial power industry
Project engineer
Paweł Perłowski
(+48) 668 022 097
pawel.perlowski@konrem.pl
"The investment required a quick reaction due to shutdown of individual devices in the CHP plant. The investment was closely tied to the schedule."
Challenge
- overhaul of 110, 15 and 6 kV distribution boards, HV 110kV, 13.8kV, 10.5kV, HV 6kV transformers and cable networks
- replacement, maintenance, restoration of distribution board equipment, transformers and networks as well as conducting necessary measurements
Solution
- inspections, repairs and measurements of distribution boards, transformers and cable networks throughout the facility
- inspections and equipment control circuit check-ups
- inspections and maintenance of generator power outputs
- overhaul of slag cranes and machine rooms
- measurements of lightning protection systems
- measurements of the effectiveness of electric shock protection
- testing electrical installations in potentially explosive areas
Result
- extending the service life of electrical devices
- checking the operation of the most important devices
- proper functioning of electrical equipment