Expansion of the compressed air installation around the coal square
Deadline
2015
PGNiG TERMIKA SA Siekierki Power Plant
Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.
Services
Power engineering, telecommunications engineering:
- overhaul and modernizations according to customer’s assumptions or with technical support (audit),
- projects and installing automation system and control & measurement devices
Industry
Commercial power industry
Project engineer
Paweł Perłowski
(+48) 668 022 097
pawel.perlowski@konrem.pl
"The project required a very good organization of work and precise planning. The investment was closely tied to the schedule created by the Investor and required timely completion. Detailed cooperation with the Investor during the task implementation was crucial."
Challenge
- project and extension of the compressed air installation around the coal square
Solution
- project of the installation extension in accordance with current standards
- a new compressed air installation around the coal square
Result
- building over 1.5 km technological pipeline for handling belt conveyors, reloading and stacker-reclaimers
- ensuring trouble-free operation of carburizing equipment around the coal square - the equipment can be cleaned up with compressed air on a regular basis which does not cause any downtime