Dismantling the old hydrochloric acid storage tank no. 4 and construction of a new one
PGNiG TERMIKA SA Siekierki Power PlantProject
Dismantling the old hydrochloric acid storage tank no. 4 and construction of a new one
Deadline
2016
PGNiG TERMIKA SA Siekierki Power Plant
Leader of changes in the heating sector. The largest producer of heat and electricity in cogeneration in Poland. It constantly improves production and management processes that increase the effectiveness and value of the company. It strives for operational excellence.
Services
Power industry, telecommunications engineering:
- projects and construction of technological lines and equipment
- projects and visualizations of superior systems (SCADA systems)
- projects and installing automation system and control & measurement devices
Industry
Commercial power industry
Project engineer
Adam Madej
(+48) 668 022 095
adam.madej@konrem.pl
"In this project it was necessary to cooperate with highly specialized suppliers with appropriate certificates and authorizations. The investment required a quick reaction due to shutdown of individual devices in the CHP plant. The investment was closely tied to the schedule."
Challenge
- replacement of the hydrochloric acid storage tank no. 4
- new tank assembly project
- purchase of a new tank in accordance with the customer's requirements
- UDT tests (the Office of Technical Inspection tests) and launching the installation
Solution
- implementation of projects in the electrical, mechanical, technological and I&C industries
- cooperation with UDT and ensuring commissioning of the tank by UDT (the Office of Technical Inspection)
- disassembly of the old tank (internal EC road block)
- assembly of the new tank along with the HCL vapour neutralization installation
- trial run of the installation
Result
- extending the operation life of the HCL storage facility by using the new tank and installation
- achieving the required neutralization of HCL vapours